Gas Courses: Domestic, Commercial and LPG

Contact us for a tailored quotation - please include copies of existing gas certification

To work with natural gas in a domestic environment, candidates must hold CCN1 as their core qualification and then achieve certification in the various appliances, Cookers, Fires, Central Heating etc.

SWPT can also provide  the Commercial to Domestic changeover (COCDN1) and LPG to Domestic (COLPNG1)

DOMESTIC APPLIANCES INCLUDE:

CENWAT - central heating boilers

HTR1 - Fires

CKR1 - Cookers

LAU1 - Laundry

DAH1 - Warm Air units

MET1 -Meters

LEI1 - Patio heaters/lights

DFDA1 - Direct fired domestic 

CKHB1 - Range Cooker

HWB1 - Swimming Pool Boilers

CMDDA - Carbon dioxide/carbon monoxide atmosphere & appliance testing

NB: CCN1 now includes CPA1 Combustion Performance Analysis as this is no longer required to be undertaken as a separate qualification when taking the core assessment. 

Either core gas assessment or a changeover assessment must be completed by the operative prior to taking any other commercial assessment.

Candidates must have achieved completion of a full Managed Learning Programme before attendance or already hold a core gas qualification.

COMMERCIAL CORE/CHANGEOVERS INCLUDE:

COCN1 (or CODNCO changeover) - Commercial gas

CCCN1 (or CODC changeover) - Commercial Catering

CCLNG (or COCCLNG changeover) - Commercial Laundry

 

Commercial (COCN1/CODNCO) Appliances include:

ICPN1 - First Fix Commercial Pipework. Installing pipework in excess of 35mm and testing up to 75mbar.

TPCP1 - Tightness testing & purging of installation pipework exceeding 1m³ in volume, up to 16 bar operating pressure (natural gas) & 2 bar operating pressure for LPG.

TPCP1A - Tightness testing and direct purging of installation pipework not exceeding 1m³ in volume, 40 mbar pressure and 150mm diameter natural gas only. Testing and purging to IGE/UP/1A or IGE/UP/1.Testing and purging commercial gas installations

ICAE1 - First Fix Commercial Appliances. Installing commercial appliances and equipment

CIGA1 -Indirect Fired Heating Appliances. Installing, commissioning, servicing and fault-finding on indirect fired heating appliances

CDGA1 -Direct Fired Heating Appliances. Installing, commissioning, servicing and fault-finding on direct fired heating appliances.

CORT1 -Radiant Plaque and Radiant Tube Heaters. Installing, commissioning, servicing and fault-finding on radiant plaque and tube heaters.

BMP - Gas Boosters and compressors, Associated controls and pipework operating at pressures not exceeding 7 bar

CGFE - installation, commission, service, repair and breakdown of gas fuelled spark ignition and dual fuelled engines (REASSESSMENT ONLY)

MET4 - Primary diaphragm type gas meters from 6 cubic metres to 40 cubic metres per hour capacity with pipework up to 2" in size 

Catering (CCCN1/CODC) appliances include:

COMCAT1 - Open/Solid Top Ranges

COMCAT2 - Water Boilers (Pressure Type)

COMCAT3 - Deep Fat & Pressure Fryers

COMCAT4 - Fish & Chip Fryers (on-site assessment only)

COMCAT5 - Forced Draught Equipment (on-site assessment only)

 

Laundry (CCLNG /COCCLNG) appliances include:

CLE - Commercial Tumble Driers

 

SWPT can also provide  LPG  reassessment (CCLP) and initial training on LPG changeover (CONGLP PD, RPH, LAV, CMC & B) and appliances - contact us for details 

Web design by Flaydemouse in Yeovil, Somerset